Operations

MUST SHOW WORK

 

An assembly line with 18 tasks is to be balanced. The longest task is 3.4 minutes, and the total time for all tasks is 20 minutes. The line will operate for 480 minutes per day.

a. What are the minimum and maximum cycle times?


b. What range of output is theoretically possible for the line?

c. What is the minimum number of workstations needed if the

maximum output rate is to be sought?


d. What cycle time will provide an output rate of 125 units per day?

 

A job was timed for 60 cycles and had an average of 1.2 minutes per piece.
The performance rating was 95 percent, and workday allowances are 10 percent. Determine each of the following:

a. Observed time.

b. Standard time.

MUST SHOW WORK

 

 

 

 
Do you need a similar assignment done for you from scratch? We have qualified writers to help you. We assure you an A+ quality paper that is free from plagiarism. Order now for an Amazing Discount!
Use Discount Code "Newclient" for a 15% Discount!

NB: We do not resell papers. Upon ordering, we do an original paper exclusively for you.